My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 02-09-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
02-09-2021
>
6.1g ERMUSR 02-09-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 3:27:31 PM
Creation date
2/9/2021 3:27:31 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Thomas Geiser – Operations Director <br />MEETING DATE: <br />February 9th, 2021 <br />AGENDA ITEM NUMBER: <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br /> <br />DISCUSSION: <br />• Staff continues to work with Kodet Architectural Group, Ltd. on design elements for the <br />field services building expansion. This month staff is presenting a construction <br />management services contract with RJM Construction for commission approval. <br /> <br />• Staff continues to have meetings with T2 Utility Engineers, WSB Engineering, and <br />MnDOT for the upcoming Highway 169 Redefine project. ERMU has received the Notice <br />and Order from MnDOT which authorizes us to start obtaining material and contact the <br />State’s assigned engineer to schedule relocation and/or adjustment work for the water <br />and electric infrastructure. <br /> <br />• As part of the Highway 169 Redefine project, the electric department is working with <br />Great River Energy on a plan to relocate transmission poles that ERMU service lines are <br />attached to. <br /> <br />• We interviewed for a lineworker last month to fill the opening created by Josh Shoutz <br />moving up to the lead lineworker position. Blaine Snyder will start Monday, February 8 <br />as an apprentice lineworker. <br /> <br /> <br />128
The URL can be used to link to this page
Your browser does not support the video tag.