My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 21-09
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
2020 - 2029
>
2021
>
RES 21-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 12:09:14 PM
Creation date
2/2/2021 12:09:14 PM
Metadata
Fields
Template:
City Government
type
RES
date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Of <br />u <br />City of Elk River <br />Ver City Council <br />Resolution 21- 9 <br />A Resolution of the City Council of the City of Elk River Accepting Bids for <br />the Public Safety Building Expansion Improvements <br />WHEREAS, the City Council, and City staff have worked with BKV Group and Terra <br />General Contractors, LLC (dba Terra Construction), on the design plans for Fire Station 3; <br />and <br />WHEREAS, the City Council approved the plans and specifications for the Fire Station 3 <br />and authorized the taking of bids for the project at its December 7t1i, 2020, meeting; and <br />WHEREAS, pursuant to the advertisement for bids for the construction of the Fire <br />Station 3 Project, bids were received for 29 project categories, opened, and tabulated <br />according to law; and <br />WHEREAS, Terra Construction, is recommending the award of the contract to <br />appropriate responsible bidders of each of the categories listed below: <br />Bid Category <br />Bid Amount <br />Company <br />BC#3A - Concrete <br />$348 900 <br />omsen Construction Services <br />BC#3B - Polished Concrete <br />$26,666 <br />.oncrete Treatments <br />BC#4A - Masonry <br />$1,115,000 <br />amco <br />BC#5A - Steel Su 1 • <br />$295,760 <br />Terra Recommends to Re -Bid <br />BC#5B - Steel Install <br />$117,750 <br />Patriot Erectors <br />BC#6A - Carpentry <br />$243,000 <br />entury Construction <br />BC#6B - Casework <br />$45,900 <br />orthern Woodwork <br />BC#7A - Roofing <br />$149,000 <br />Horizon Roofing <br />BC#7B - Metal Roofing & Wall Panels <br />$236,124 <br />1 orizon Roofing <br />8C#7C -Fluid Applied Air Barrier <br />$38,600 <br />Herzog Coatings <br />BC#7D -joint Sealants <br />$45,470 <br />unrise Specialty Contracting <br />C#8A - Doors, Frames & Hardware (Material Only, <br />$94,389 <br />4id Central Door <br />BC#8B - Sectional Doors <br />$89,987 <br />lmerican Door Works <br />BC#8C - Glass & Glazing <br />$163,500 <br />Hallmark Glass <br />BC#9A - Gypsum Board <br />$163,647 <br />eimeal Design & Construction <br />BC#9B - Tile <br />$49,815 <br />imps Construction Group <br />BC#9C - Acoustical Ceilings <br />$89,350 <br />onus Interiors <br />BC#9D - Carpet & Resilient <br />$19;500 <br />entennial Flooring <br />p 0 1 E O E 0 8 Y <br />NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.