My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1h ERMUSR 01-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
01-12-2021
>
6.1h ERMUSR 01-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 11:26:27 AM
Creation date
1/11/2021 11:26:27 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Chris Sumstad– Electric Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />January 12, 2021 6.1h <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Installed 10 new residential services, which involves the connection of a secondary line <br />once the customer requests service. <br /> Finished tearingdown the overhead line and removing poles for the Edison Street <br />rebuild. <br /> Energized three new underground feeders that were installed for the field services <br />facility expansion project and removed a portion of the overhead line inside the plant <br />yard. Some work will continue indoors this winter and one more feeder will be installed <br />beginning in the spring. <br /> <br /> Finished installing underground line for the Trout Ridge Run Addition. <br /> <br /> Installed a new three phase service for a customer located on Tyler Street. <br /> <br />Rerouted an existing service at the Freeport Street Water Tower for the new Verizon <br />Wireless building that will be constructed at the site. The new service will be connected <br />later this winter. <br /> <br /> Tightened hardware and made repairs as needed on Feeder 61 after the high winds <br />th <br />during the December 23 snowstorm. This line runs through the gravel pits along 213 <br />th <br />Avenue, Proctor Road, and 205 Avenue NW. <br /> <br /> Replaced two streetlights that were struck by vehicles during the December 23 <br />snowstorm, one at Meadowvale Road and County Road 35, the other on southbound <br />Highway 169. <br /> <br />______________________________________________________________________________ <br />Page 1 of 2 <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.