My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-2-2020 Special Meeting Handout
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2020
>
12-02-2020 Special
>
12-2-2020 Special Meeting Handout
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 7:26:17 PM
Creation date
12/28/2020 7:25:30 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AAAE(OH <br />)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)E(OH)UNISEX101 UNISEX102 UNISEX103 UNISEX104MECH105105 PICNIC SHELTER106 <br />I hereby certify that this plan,specification, or report was preparedby me or under my direct supervisionand that I am a duly LicensedLandscape Architect under the laws ofthe State of Minnesota.SHEETDATE:LICENSE #:PRINT NAME:REVISIONSDATENO.BYCHKDAPPRDRAWN BYDESIGNED BYCHECKED BYCOMM. NO.SIGNATURE:02013673-A12/02/2020TIMOTHY B. WOLD42164J. FILLMORET. WOLDK. GRIESHABERL4.0ORONO PARK <br />CITY OF ELK RIVER <br />GENERAL SITE IMPROVEMENTS <br />OVERALL LANDSCAPE PLAN <br />GARY ST NORTH PARK LANDSCAPEENLARGEMENT PLAN 1 -SEE SHEET L4.6SOUTH PARK LANDSCAPEENLARGEMENT PLAN 3 -SEE SHEET L4.4PICKLEBALL/BASKETBALLCOURT LANDSCAPEENLARGEMENT PLAN -SEE SHEET L4.1BEACH LANDSCAPEPLAN - SEE SHEET L4.9ORONO RD NWUS HWY 10ORONO LAKECENTRAL PARK LANDSCAPEENLARGEMENT PLAN - SEESHEET L4.5NORTH PARK LANDSCAPEENLARGEMENT PLAN 2 -SEE SHEET L4.7NORTH PARK LANDSCAPEENLARGEMENT PLAN 3 -SEE SHEET L4.8SOUTH PARK LANDSCAPEENLARGEMENT PLAN 2 -SEE SHEET L4.3SOUTH PARK LANDSCAPEENLARGEMENT PLAN 1 -SEE SHEET L4.2TURF ESTABLISHMENT NOTES:1.PROTECT ALL EXISTING STRUCTURES, UTILITIES, TREES,SITE AMENITIES, ETC.2.CONTRACTOR SHALL COORDINATE LOCATION ANDMARKING OF ALL UNDERGROUND UTILITIES ACCORDING TOSTATE LAW PRIOR TO ANY WORK COMMENCING.3.CONTRACTOR SHALL REPAIR AND RESTORE ANY EXISTINGIRRIGATION SYSTEMS THAT ARE DAMAGED DURINGCONSTRUCTION AND LANDSCAPING.4.REPORT ALL LAYOUT DISCREPANCIES IMMEDIATELY TO THELANDSCAPE ARCHITECT FOR DIRECTION PRIOR TOPROCEEDING.5.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECTAT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OFANY WORK.10.REFER TO PROJECT SPECIFICATIONS FOR ADDITIONALREQUIREMENTS.11.CONSTRUCTION SHALL BE GOVERNED BY THE 2018 EDITIONOF THE MNDOT SPEC BOOK AND THE SPECIAL PROVISIONS.IRRIGATION NOTES:1.SEE SPECIAL PROVISIONS FOR REQUIREMENTS.GENERAL NOTES:1.STATE LAW: 48 HOURS BEFORE EXCAVATION BEGINSCONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT651-454-0002 FOR FIELD LOCATION OF UNDERGROUND UTILITIES.2.CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN ALLNECESSARY TRAFFIC CONTROL DEVICES TO THE SATISFACTIONOF THE OWNER.3.CLEAR AND GRUB VEGETATION WITHIN CONSTRUCTION LIMITSAND AS REQUIRED TO CONSTRUCT THE PROPOSEDIMPROVEMENTS. VERIFY LIMITS WITH OWNER.EROSION CONTROL NOTES:1.THE CONTRACTOR SHALL INSTALL EROSION CONTROLMEASURES AS SHOWN ON THE PLANS AND AS REQUIRED TOPREVENT SILT MIGRATION PRIOR TO BEGINNING CONSTRUCTION.THESE MEASURES SHALL INCLUDE INLET PROTECTION AT ALLSTORMWATER INLETS RECEIVING RUN OFF FROM THE PROJECTSITE.2.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A 30' WIDE X50' LONG ROCK ACCESS DRIVE FOR THE DURATION OFCONSTRUCTION. THE CONTRACTOR SHALL REMOVE THEACCESS DRIVE AND RESTORE ALL AREAS DISTURBED BYCONSTRUCTION ACTIVITIES AND ACCESS UPON COMPLETION OFCONSTRUCTION.3.THE CONTRACTOR SHALL INSTALL AND MAINTAIN CATEGORY 3N(NON-WLEDED) EROSION CONTROL BLANKET ON ALL SLOPES 3:1OR STEEPER.TREE PROTECTION NOTES:1.PROTECT ALL TREES IN IMMEDIATE VICINITY OF WORK. NOPARKING VEHICLES OR EQUIPMENT UNDER DRIP LINES OFTREES.2.TREE PROTECTION TO BE SNOW OR CONSTRUCTION FENCE OF 4'HEIGHT WITH POSTS 8' O.C. WITH 2' MIN. BURY AT THE DRIPLINEOR OUTERMOST BRANCHES. FENCE TO ENCIRCLE TREE WITHINCONSTRUCTION LIMITS. THE OWNER WILL IDENTIFY TREEPROTECTION FENCING LOCATIONS.3.TREE PROTECTION FENCING SHALL BE CONSIDERED INCIDENTALTO GRADING OPERATIONS.LEGENDDECIDUOUS TREEUNDERSTORY TREESHRUBEXISTING TREESTURF SEED MIXSTORMWATER SEED MIXIRRIGATION LIMITSSILT FENCECONSTRUCTION LIMITSPLANT SCHEDULE
The URL can be used to link to this page
Your browser does not support the video tag.