UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />October 13, 20206.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Delivered 3 new water meters. <br /> Sealed the water meter, installed encoder receiver transmitter,and took curb stop ties <br />from 4 water services. <br /> Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> Completed 21 routine fluoride samples <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report <br /> Submitted Discharge Monitoring Report for theDiesel Generation Plant to the <br />Minnesota Pollution Control Agency. <br /> The total cost for repairing the damaged 24-inch water main that was struck by a soil <br />boring machine in August at Highway 169 and School Street is $26,198.39. ERMU staff <br />labor made up $4,099.80 of that cost. Hiring Brenteson Companies to cut out and <br />replace the damaged section of water main, plus restoration of the site, was $22,098.59. <br />In addition to these costs the estimated amount of water lost was 200,000 gallons which <br />would equate to $714.42 at the Tier 1 water rate. <br /> Water department staff worked closely with city staff to drawdown LakeOrono within <br />DNR regulations for the Lake Orono Restoration and Enhancement project <br /> Water Operator Derek Palmer started on September 21. <br /> The water operators discovered a leaking water main gate valve at the intersection of <br />th <br /> Avenuewhile carrying out our valve exercise maintenance <br />Zumbro Avenue and 188 <br />program. The bolts holding the valve together had corroded to the point of failure, <br />causing the valve to leak. There are three valves located in this intersection; ERMU staff <br />excavated the street and replaced the bolts on all three valves <br /> <br />ATTACHMENTS: <br /> September 2020 Pumping by Well <br /> <br />______________________________________________________________________________ <br />Page 1 of 1 <br />83 <br />