My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.K ERMUSR 09-08-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
09-08-2020
>
6.1.K ERMUSR 09-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 4:04:03 PM
Creation date
9/3/2020 4:04:03 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU CommissionChris Kerzman– Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />September 8, 2020 6.1k <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> The IT/OTTechnician has been working to set up laptops and phone system upgrades to <br />allow for staff to better work from home as needed with hybrid school schedules. He <br />has also spent quite a bit of time helping with the commission room updates, planning <br />for the IT needs of the field services building, and working with the City of Elk River on <br />budget costs for next year. <br /> The technology upgrades have been completed in the commission room, and the <br />contractor has trained ERMU staff on the operation of the new equipment. The <br />upgrades look great and staff is excited to start using the room again. <br /> <br /> We are working with the civil consultants on finalizing locations of the electric <br />infrastructure that needs to be moved for the field services facility. There are a few <br />locations wherethe new stormwater system will affect the routing of our cabling. <br /> <br /> Applications were submitted to the City for conditional use permit, easement vacation, <br />preliminary plat, final plat, rezoning, and variance for parking and impervious surface for <br />the field services facility. Our anticipated schedule is that applications will be reviewed <br />by the Planning Commission on September 24 and by the City Council on October 19. <br />We are moving on to the detail design phase with Kodet Archetecural Group, Ltd. and <br />have our next meeting is scheduled for September 23. <br />______________________________________________________________________________ <br />Page 1 of 1 <br />95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.