My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.J ERMUSR 09-08-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
09-08-2020
>
6.1.J ERMUSR 09-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 4:03:48 PM
Creation date
9/3/2020 4:03:48 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />September 8, 20206.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Delivered 13 new water meters. <br /> Sealed the water meter, installed encoder receiver transmitter, and took curb stop ties <br />from 15 water services. <br /> Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the <br />Minnesota Department of Health (MDH). <br /> Completed 21 routine fluoride samples <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report <br /> Completed two Total Trihalomethanes and Haloacetic Acids samples for the MDH. <br /> Interior painting has been completed in the Gary Street Water. There was a slight delay <br />in getting the tower back in service because a shear pin on the shut off valve broke <br />when staff attempted to open the valve. Utilities staff excavated and repaired the valve, <br />the tower is now back in service. <br />Our new Water Operator Chad Johnson started on August 31. <br />The water operators have been locating and exercising watermainvalves located in the <br />2020 and 2021 street project areas. This allows us to identify if there are issues with any <br />valves and excavate to make repairs before new roadsurfaces areconstructed. <br />ATTACHMENTS: <br /> August 2020 Pumping by Well <br />______________________________________________________________________________ <br />Page 1 of 1 <br />93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.