Laserfiche WebLink
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Mark Fuchs – Operations Director <br />MEETING DATE: AGENDA ITEM NUMBER: <br />September 8, 20206.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Staff continues to work with Kodet Architectural Group, Ltd. ondesign elements for the <br />new fieldservicesbuilding. Staff is also working with LandformProfessional Services, <br />LLC on acquiring the permits necessary to begin building. <br /> <br />Staff hada meetingwith T2 Utility Engineers, WSB Engineering, and MnDOT for the <br />upcoming Highway 169 Redefine project. Therewill be a lotof water and electric <br />infrastructure that will need to be adjusted or relocated. There is another meeting <br />scheduled for September 10. <br /> <br /> Staff is assessing the Highway 10 reconstruction plans; this project is scheduled to begin <br />in April 2021. <br /> <br /> Staff is working on the 2021 Capital Budgets. More details are provided in item 5.2 of <br />this packet. <br />______________________________________________________________________________ <br />Page 1 of 1 <br />90 <br />