My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. HRSR 07-06-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2020-2029
>
2020
>
07-06-2020
>
7.3. HRSR 07-06-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:49:30 AM
Creation date
7/2/2020 9:10:50 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
7/6/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br /> City of <br /> Elk , Request for Action <br /> River <br /> To Item Number <br /> Housing and Redevelopment Authority 7.3 <br /> Agenda Section Meeting Date Prepared by <br /> General BusinessJuly 6, 2020 Amanda Othoudt,EDD <br /> Item Description Reviewed by <br /> Main and Gates Redevelopment Findings of Fact Cal Portner, City Administrator <br /> Reviewed by <br /> Action Requested <br /> Approve,by motion, a resolution finding parcels are occupied by structurally substandard buildings. <br /> Background/Discussion <br /> At their April 3, 2017, meeting, the HRA directed staff to move forward with the steps necessary to create a <br /> redevelopment plan for the property located at the intersection of Main Street, Gates Avenue NW and 3 <br /> Street. As part of this project,the HRA or the city may incur certain costs related to the creation of a TIF <br /> District which may be financed on a temporary basis from available HRA funds. <br /> The HRA proposes to reimburse itself for the administrative costs incurred prior to the establishment of the <br /> TIF District, subject to the limitations of the TIF Act, and certain costs incurred in connection with a study of <br /> blighted conditions, engineering,land and building acquisition,demolition and site preparation in an aggregate <br /> amount not to exceed $1,300,000 as amended on April 6, 2020. <br /> To create a Redevelopment TIF District per Minnesota Statutes, Section 46.174, the city and the HRA must <br /> determine before the demolition or removal of any substandard building that certain conditions existed. "The <br /> total coverage of the proposed TIF District have parcels consisting of 70 percent of the area of the district are <br /> occupied by buildings, streets,utilities,paved or gravel parking lots, or other similar structures and more than <br /> 50 percent of the buildings, not including outbuildings, are structurally substandard to a degree requiring <br /> substantial renovation or clearance." <br /> On October 7,2019, the HRA and the City Council adopted resolutions designating 326 Gates Ave NW,414, <br /> 426 and 430 Main Street NW as structurally substandard prior to being demolished or removed in anticipation <br /> of creating a redevelopment or renewal and renovation tax increment financing district based on the TIF <br /> Analysis Findings dated September 6, 2019. <br /> The HRA engaged LHB,Inc. to conduct an inspection on two additional properties acquired by the HRA to <br /> determine if the proposed district meets the requirements. On June 1, 2020,LHB found 406 Main St NW to be <br /> structurally substandard under the definition set forth in the Minnesota Statutes, Sections 469.174 to 469.1794. <br /> A resolution must be adopted by the HRA and the city designating the buildings structurally substandard <br /> before the creation of the TIF District. <br /> The Elk River Vision <br /> A Y�elcoming community nvith revolutionary and spirited resourcefulness, exceptional p D W E H E D D Y <br /> service, and community engagement that encourages and inspires prosperity ,g /` UR <br />
The URL can be used to link to this page
Your browser does not support the video tag.