UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Mark Fuchs – Operations Director <br />MEETING DATE: AGENDA ITEM NUMBER: <br />June 9, 2020 6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Staff has been putting together prices to install infrastructure at Great River Energy’s <br />(GRE)Refuse-Derived Fuel(RDF)Facilityfor its potential sale. As this facility currently <br />receiveselectricity fromGRE transmissionlines, it willneed to be switched over to <br />ERMU’s distribution lines. The current voltage feeding the facility is 2400, while <br />distribution voltage is 7200, so the switch requires a transformer to reduce the voltage. <br /> <br /> Staff continues to work with Kodet Architectural Group on the new field services <br />building. The new power plant substation transformer, which was scheduled to be <br />delivered in late October or early November, may not be delivered until February 2021. <br />We are working with the manufacturer to see what options we have to move up the <br />delivery date. <br /> <br /> Staff continues working with Power Systems Engineering on plans to install electrical <br />infrastructure to make room for the new field services building. <br /> <br /> Staff is going through construction plans for County State-Aid Highway 12 to see what <br />electric and water infrastructure needs to be moved. This project is scheduled to begin <br />in July. <br />______________________________________________________________________________ <br />Page 1 of 1 <br />147 <br />