My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.G ERMUSR 06-09-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
06-09-2020
>
6.1.G ERMUSR 06-09-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:00:27 AM
Creation date
6/8/2020 11:00:27 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/9/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Mark Fuchs – Operations Director <br />MEETING DATE: AGENDA ITEM NUMBER: <br />June 9, 2020 6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Staff has been putting together prices to install infrastructure at Great River Energy’s <br />(GRE)Refuse-Derived Fuel(RDF)Facilityfor its potential sale. As this facility currently <br />receiveselectricity fromGRE transmissionlines, it willneed to be switched over to <br />ERMU’s distribution lines. The current voltage feeding the facility is 2400, while <br />distribution voltage is 7200, so the switch requires a transformer to reduce the voltage. <br /> <br /> Staff continues to work with Kodet Architectural Group on the new field services <br />building. The new power plant substation transformer, which was scheduled to be <br />delivered in late October or early November, may not be delivered until February 2021. <br />We are working with the manufacturer to see what options we have to move up the <br />delivery date. <br /> <br /> Staff continues working with Power Systems Engineering on plans to install electrical <br />infrastructure to make room for the new field services building. <br /> <br /> Staff is going through construction plans for County State-Aid Highway 12 to see what <br />electric and water infrastructure needs to be moved. This project is scheduled to begin <br />in July. <br />______________________________________________________________________________ <br />Page 1 of 1 <br />147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.