My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 ERMUSR 06-09-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
06-09-2020
>
5.4 ERMUSR 06-09-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 10:50:38 AM
Creation date
6/8/2020 10:50:38 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/9/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Chris Kerzman –Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />June 9, 2020 5.4 <br />SUBJECT: <br />Field Services Facility Expansion Project Architectural Costs <br />ACTION REQUESTED: <br />Approve the payment of Architect’s and Engineer’s fees for this year out of reserves, with the <br />intent of replenishing reserves out of bonding in 2021. <br />BACKGROUND: <br />The Field Services Facility Expansion Workgroup has met with Kodet Architectural Group <br />virtually this year to review the design of the field services building expansion. During these <br />meetings, the footprint and budget for the building have been revised to meet field staff needs <br />with consideration for long-term budgeting and coordination with the rate design study. Kodet <br />advises that construction pricing should be favorable if the project is bid with construction to <br />begin in spring 2021. Staff is hopeful that the majority ofconstruction can be completed before <br />the Highway 169 project begins. A preliminary copy of the site plan is attached. <br /> <br />DISCUSSION: <br />Staff is looking to move forward with the design of the new field services building and the <br />preparation of bid documents to be completed by the end of the year. <br /> <br />FINANCIAL IMPACT: <br />Kodet has estimated that architectural and engineering fees will be $846,050, which includes <br />$776,300 for architectural fees; $9,750 for soils testing; and $60,000 for civil engineering.As it’s <br />estimated that approximately 75% of these costs will be billed this year, staff is requesting <br />approval of up to $846,050 to be paid out of reserves this year, with the intent to replenish the <br />withdrawnamount from bonding in 2021. <br />ATTACHMENTS: <br /> Field Services Building Preliminary Plans <br />______________________________________________________________________________ <br />Page 1 of 1 <br />132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.