My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 PRSR 06-10-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2020
>
06-10-2020
>
10 PRSR 06-10-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 1:56:00 PM
Creation date
6/5/2020 1:55:57 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
6/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br /> <br />To: Parks and Recreation Commission <br /> <br />From: Michael Hecker, Parks and Recreation Director <br /> <br />Date: June 10, 2020 <br /> <br />Subject: Director’s Report <br /> <br />This report is a monthly highlight of department activities related to recent collaborations, strategic <br />planning, staff changes/developments, and park operations. <br /> <br />Steve Benoit Resignation <br />Steve Benoit has tendered his resignation effective July 1. He has accepted Shoreview’s Parks and <br />Recreation Director position. Steve came to Elk River from Shoreview and will be an asset to their team. <br />In the interim, Tim Dalton will take on Steve’s responsibilities. Tim has held the position of recreation <br />manager in his previous employment and we expect he will be up for the challenge. Incidentally, our <br />former park maintenance superintendent, Rodney Schreifels also works for Shoreview. Rodney had left <br />Elk River to take on a family business opportunity in Oklahoma and returned a couple of years ago. <br />CSAH 12 Highway Construction <br />The Commission has been reviewing this project since it was presented by the county as an open house in <br />early January. It was recommended by the Commission May 13, 2020, and approved by City Council June <br />1 for construction this summer. <br /> <br />Active Elk River Park Improvements Orono Park and YAC <br />SRF Consulting has reviewed the YAC building and they are making progress on the Orono Park <br />analysis. They have the following currently in progress: <br />- Working through site layout with focus on accessibility, site grading, and minimizing impacts <br />to existing utilities. <br />- Development of a preliminary cost estimate based on the site layout. <br />- Architect HCM has developed a preliminary spatial program for the shelter, restroom, and <br />watercraft rental spaces and is preparing conceptual layouts. <br />- SRF & HCM are planning to meet early next week to integrate site layout and building <br />concepts. They will be meeting with staff in the next few weeks. <br /> <br />Item: 10
The URL can be used to link to this page
Your browser does not support the video tag.