Laserfiche WebLink
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Tom Sagstetter – Conservation & Key Accounts Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />May 12, 2020 5.3 <br />SUBJECT: <br />Electric and Water Cost of Service and Rate Design Study <br />ACTION REQUESTED: <br />Review the Electric and Water Cost of Service and RateDesign Study Draft Reports <br />BACKGROUND: <br />ERMU staff has been working with Dave Berg Consulting, LLC on electric and water cost-of- <br />service and rate design studies. The work was done to evaluate possible changes to electric and <br />water retail rates, and applicable fees for each utility. Staff evaluated changes in operating <br />conditions, including but not limited to monthly fixed costs, additional service fees, bonding for <br />the new field services building, and retail energy and water rates. <br /> <br />DISCUSSION: <br />Mr. Berg will discuss the preliminary findings prior to the preparation of the final reports. <br /> <br />ATTACHMENT: <br /> Electric Cost of Service and Rate Design Study – Draft Report <br /> Water Cost of Service and Rate Design Study – Draft Report <br /> <br /> <br /> <br />______________________________________________________________________________ <br />Page 1 of 1 <br />141 <br />