Laserfiche WebLink
<br />VILLAGE OF ELK RIVER COUNCIL MEETING <br />October 31, 1960 <br /> <br />A special meeting was held at Village Hall on October 31, 1960 for the purpose of making <br />assessment for Sewer Improvements. Figures for total cost of sections A, B & C footage and rate <br />per foot are attached. <br /> <br />A motion was made by Briggs and seconded by Bergerson to authorize Mayor and Clerk to sign <br />contract with the village of Dayton to furnish them with light and power. <br /> <br /> <br />Elk River Sanitary Sewer System <br />1960 Extensions <br />Section C <br />Industrial Area <br />Total footage to be assessed 1686.40 <br />Rate per foot 6.63 <br />Total to be assessed $11,180.83 <br />Cost of Construction 10,063.40 <br />Eng and Assessment Costs 11,106.97 <br />$11,170.37 <br /> <br />Elk River Sanitary Sewer System <br />1960 Extensions <br />Section B <br />Orono Area <br />Total footage to be assessed 7029.90 <br />Rate per foot 6.34 <br />Total to be assessed $44,569.57 <br />Construction Cost 58,178.50 <br />En and Assessment Costs 6,399.64 <br />64,578.14 <br />20,000.00 <br />Less Lift station 44,578.14 <br /> <br />Elk River Sanitary Sewer System <br />1960 Extensions <br />Section A <br />Upland Area <br />Total footage to be assessed 8495.34 <br />Rate per foot 5.72 <br />Total to be assessed $48.593.34 <br />Construction cost 42,638.70 <br />Engineering and assessment 4,689.16 <br />Const. Cost (Robt. Olson Ext.) 1,271.30 <br />Eng cost 10.00 <br />$48,599.16 <br /> <br />