My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-31-1960 VCM Special
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
Village Council 1919-1973
>
1960-1969
>
1960
>
10-31-1960 VCM Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 11:58:37 AM
Creation date
5/4/2020 8:40:17 AM
Metadata
Fields
Template:
City Government
type
VCM
date
10/31/1960
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VILLAGE OF ELK RIVER COUNCIL MEETING <br />October 31, 1960 <br /> <br />A special meeting was held at Village Hall on October 31, 1960 for the purpose of making <br />assessment for Sewer Improvements. Figures for total cost of sections A, B & C footage and rate <br />per foot are attached. <br /> <br />A motion was made by Briggs and seconded by Bergerson to authorize Mayor and Clerk to sign <br />contract with the village of Dayton to furnish them with light and power. <br /> <br /> <br />Elk River Sanitary Sewer System <br />1960 Extensions <br />Section C <br />Industrial Area <br />Total footage to be assessed 1686.40 <br />Rate per foot 6.63 <br />Total to be assessed $11,180.83 <br />Cost of Construction 10,063.40 <br />Eng and Assessment Costs 11,106.97 <br />$11,170.37 <br /> <br />Elk River Sanitary Sewer System <br />1960 Extensions <br />Section B <br />Orono Area <br />Total footage to be assessed 7029.90 <br />Rate per foot 6.34 <br />Total to be assessed $44,569.57 <br />Construction Cost 58,178.50 <br />En and Assessment Costs 6,399.64 <br />64,578.14 <br />20,000.00 <br />Less Lift station 44,578.14 <br /> <br />Elk River Sanitary Sewer System <br />1960 Extensions <br />Section A <br />Upland Area <br />Total footage to be assessed 8495.34 <br />Rate per foot 5.72 <br />Total to be assessed $48.593.34 <br />Construction cost 42,638.70 <br />Engineering and assessment 4,689.16 <br />Const. Cost (Robt. Olson Ext.) 1,271.30 <br />Eng cost 10.00 <br />$48,599.16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.