My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.6 ERMUSR 04-14-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
04-14-2020
>
2.6 ERMUSR 04-14-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:04:28 PM
Creation date
4/13/2020 2:04:28 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br /> <br />TO: FROM: <br />ERMU Commission Tom Sagstetter Conservation & Key Accounts Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />April 14, 2020 2.6 <br />SUBJECT: <br />2019 Annual Distributed Generation & Cogeneration Report <br />ACTION REQUESTED: <br />Receive and file the 2019 Annual Distributed Generation & Cogeneration Report <br /> <br />BACKGROUND: <br />Compliance with Minnesota Statutes 216B.164 Cogeneration and Small Power Production, and <br />Minnesota Statutes 216B.1611 Interconnection of On-Site Distributed Generation, requires the <br />ERMU Commission to receive the Annual Distributed Generation & Cogeneration Report. <br /> <br />DISCUSSION: <br />Staff prepares and submits an annual update to the Minnesota Public Utilities Commission that <br />details the Distributed Energy Resources (DER) and Cogeneration Systems activity within the <br />ERMU service territory. The information provided in this filing includes utility contact <br />information, number and types of existing systems, systems that have applied for <br />interconnection, and systems that have been removed from service. <br /> <br />The attached document summarizes the existing systems that are currently connected to the <br />ERMU distribution system. ERMU does not have any applications pending for interconnection <br />and no systems were removed in 2019. <br /> <br />ATTACHMENTS: <br />2019 Distributed Generation & Cogeneration Report <br />______________________________________________________________________________ <br />Page 1 of 1 <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.