My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e ERMUSR 03-10-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
03-10-2020
>
6.1e ERMUSR 03-10-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 4:16:12 PM
Creation date
3/6/2020 4:16:12 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />March10, 2019 6.1e <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Delivered threenew water meters. <br /> Sealed the water meter, installed an encoder receiver transmitter, and took curb stop <br />ties from threewater services. <br /> Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmednegative for Coliform Bacteria <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> Completed 19 routine fluoride samples <br />o All samples met MDH standards <br />o Submitted MDH Fluoride Report <br />o Completed one MDH validation fluoride sample <br /> Submitted Discharge Monitoring Report (DMR) for the Diesel Generation Plant to the <br />Minnesota Pollution Control Agency. <br /> Submitted Tier II Annual Reports to Homeland Security for the Diesel Generation Plant <br />and all the Water Treatment Plants. <br /> We extended two separate offers for the vacant Water Operator position which were <br />both declined. Thereisanother interview scheduled for March 6. <br /> We met with Verizon Wireless to discuss the upgrades they will be doing in March to <br />their antenna equipment on Johnson Street Water Tower. <br />The water operators have spent much of their timeworking on annual preventive <br />maintenance on the water treatment plants. <br /> <br />ATTACHMENTS: <br />February2020Pumping by Well <br />______________________________________________________________________________ <br />Page 1 of 1 <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.