My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. PCSR 02-25-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
02-25-2020
>
5.4. PCSR 02-25-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 1:53:55 PM
Creation date
2/21/2020 12:56:34 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Request for Action <br /> <br /> <br /> <br />To Item Number <br />Planning Commission 5.4 <br />Agenda Section Meeting Date Prepared by <br />Public Hearings February 25, 2020 Zack Carlton, Planning Manager <br />Item Description Reviewed by <br />ISD 728 – 900 School Street <br />Chris Leeseberg, Senior Planner <br /> Conditional Use Permit for Parking Lot <br />Reviewed by <br />Improvements, Case No. CU 20-01 <br /> <br /> <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit <br />allowing improvements and modifications to the Elk River High <br />School and Multi-Purpose Center Parking lot, with the following <br />conditions: <br />1. Staff approval of updated plans addressing comments outlined in <br />the February 19, 2020, letter from BKBM. <br /> <br />Background/Discussion <br />The applicant is proposing to modify and expand the parking area <br />located between Elk River High School, the multi-purpose facility, <br />and VandenBerge Middle School. The current proposal leaves the <br />existing signal at Lion’s Park Drive in place, relocates the stormwater <br />pond to the expanded treatment pond in Lion’s Park, and redesigns <br />the drive lanes and parking areas within the existing parking lots. <br /> <br />Comprehensive Plan <br />The Comprehensive Plan guides the area for Public/Institutional <br />uses, which is consistent with the proposed development <br /> <br />Site Plan <br />Updated plans include three entrances from School Street, which are <br />generally located in a similar location as the existing driveways. The <br />two-lane driveway closest to the high school only allows entry from <br />School Street, and merges with a third lane to facilitate perimeter circulation and pick-up/drop-off at the <br />High School and Multi-Purpose facility. The perimeter drive lane keeps most traffic out of the parking <br />area and directs traffic to the western-most driveway near VandenBerge. The existing signalized <br />intersection will remain in place but includes additional curbing and parking islands to direct traffic to <br />drive lanes. <br /> <br /> <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires prosperity <br />
The URL can be used to link to this page
Your browser does not support the video tag.