Laserfiche WebLink
UTILITIES COMMISSION MEETING <br /> <br />TO: FROM: <br />ERMU Commission Tom Sagstetter Conservation & Key Accounts Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />January 14, 2020 2.4 <br />SUBJECT: <br />2020 Schedule of Rates <br />ACTION REQUESTED: <br />Approve the revisions to the 2020 Schedule of Rates <br /> <br />BACKGROUND: <br />In December, the 2020 Annual Business Plan was approved, including the 2020 Schedule of <br />Rates & Fees. The ERMU Commission recommended that staff revise two of the rate sheets to <br />address inconsistencies. <br /> <br />DISCUSSION: <br />Staff is proposing to completely remove the Cycled Air-Conditioning Program from the Energy <br />Management Program Rates. This program was in moratorium effective February 14, 2017 and <br />has since been eliminated as a program offered or maintained by ERMU. In addition, the <br />reference to the Cycled Air-Conditioning program will be eliminated from the Special Conditions <br />sections of the Commercial All Electric with Ground Source Heat Pump Service Rate. <br /> <br />The final revision is to remove the summer and winter rate designation on the Commercial All <br />Electric with Ground Source Heat Pump Service Rate. The differentiation between summer and <br />winter is no longer needed because ERMU now references applicable taxes in a more general <br />sense than specifically calling out the exemption for sales tax for winter electric heating. <br /> <br />ATTACHMENTS: <br /> Schedule of Rates <br /> Revised Energy Management Program Rates <br /> Revised Commercial All Electric with Ground Source Heat Pump Service Rate <br /> <br />______________________________________________________________________________ <br />Page 1 of 1 <br />40 <br />