My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
5.2. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 4:01:15 PM
Creation date
12/19/2019 4:01:15 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br /> <br />TO: FROM: <br />ERMU Commission Dave Ninow Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />December 17, 2019 5.2 <br />SUBJECT: <br />Gary Street Water Tower Rehabilitation Bids <br />ACTION REQUESTED: <br />Award the Gary Street Water Tower Rehabilitation Bid to Elevation Coating, LLC for the amount <br />of $267,900.00. <br /> <br />BACKGROUND: <br />The Gary Street Water Tower was originally constructed and painted in 1995. The exterior of <br />the tower was reconditioned in 2011, the interior paint coating was only spot repaired at that <br />time. The interior dry section of the tower was reconditioned in 2015. The interior wet section <br />of the tower is scheduled to be reconditioned in 2020. We went out for bids early with the <br />expectation that we would receive better than average bids. <br /> <br />DISCUSSION: <br />The bid opening was December 9, 2019 at 1:00 p.m.; nine bids were received. The low bidder <br />was Elevation Coating, LLC with an amount of $267,900.00. Staff and Short Elliot Hendrickson, <br />Inc. (SEH) recommend awarding the bid to the lowest bidder, Elevation Coating, LLC, for the bid <br />amount of $267,900.00. Attached is the bid tabulation and letter of recommendation. <br /> <br />FINANCIAL IMPACT: <br />As presented above. There will also be some additional costs associated with engineering and <br />inspections for the project which are included in the 2020 budget. <br /> <br />ATTACHMENT: <br />Gary Street Water Tower Rehabilitation Bid Tabulation <br />SEH Letter of Recommendation <br /> <br />______________________________________________________________________________ <br />Page 1of 1 <br />553 <br />
The URL can be used to link to this page
Your browser does not support the video tag.