My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-068 RES
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
1990 -1999
>
1994
>
051-075
>
94-068 RES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 2:36:15 PM
Creation date
6/28/2005 10:42:26 AM
Metadata
Fields
Template:
City Government
type
RES
date
6/27/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION 94 - 68 <br />A RESOLUTION RENEWING THE MAINTENANCE AGREEMENT FOR THE <br />WRIGHT/SHERBURNE BRIDGE 86515 <br /> <br />MAINTENANCE AGREEMENT (1994-1995) <br /> <br />- THIS AGREEMENT made and entered into by and between the City of Elk River hereinafter referred to as <br />Wlne "City" and the County of Wright hereinafter referred to as the "County.. <br /> <br />WHEREAS, it is deemed to the best interest of all parties that the duties and responsibilities of both the City and <br />the County as to maintenance on Bridge #86515 and its approaches should be clearly defined. <br /> <br />NOW THEREFORE, IT IS AGREED with regard to said structure maintenance: <br /> <br />MAINTENANCE <br /> <br />CITY RESPONSIBLE FOR: <br />(1) Maintenance of street lights; <br />(2) Removal of snow from sidewalk; <br />(3) Maintenance of slopeslbenns and roadway on nonh approach (includes: rurf maintenance, biruminous <br />maintenance, drainage and riprap maintenance); <br />(4) Periodic sweeping to remove sand and debris and removing sand/dirt from expansion joints; <br />(5) Removal of markings/spray paint etc. from visible surfaces of bridge structure. <br /> <br />COUNTY RESPONSIBLE FOR: <br />(1) Snow and ice control from bridge and approaches; <br />(2) Signing for bridge and approaches; <br />(3) Maintenance of slopeslbenns and roadway on south approach (includes: turf maintenance, bituminous <br />maintenance, drainage and riprap maintenance); <br />(4) Centerline and edge pavement marking (includes stop bar). <br /> <br /> <br />The agreement between the City and County shall be for a two year period and run from January I, 1994 to <br />December 31, 1995. Ail maintenance responsibilities will be deemed .offsetting" therefore no payments will be required <br />for the individual maintenance work which conforms to the areas stated herein and performed under authorization of either <br />the City or County. <br /> <br />e In the event that the structure needs major maintenance/rehabilitation an agreement detailing the w~rk and shared <br />costs must be approved a.,ld accepted by the City and County. <br /> <br />ADOPTED: <br />L ;J-, ,199f <br />f7 <br /> <br />ATTEST: <br /> <br />~. .~ <br />,l2..C:;: <br /><:ity Clerk . <br /> <br />;]/ <br />~.~. <br />/"-<t~'l <br />Mayor' // <br /> <br />;~- -.L <br /> <br />-/ f V1/U?;O~""""'"~ <br /> <br />CERTIFICATION <br /> <br />I hereby certify that the above is a true and correct copy of a resolution duly passed, adopted and approved by the <br />City Council of said City on 01.c.c....-;} 7 ' 19V <br /> <br />. tI <br />. ~ .-e... c;' ~...L < <, <br />City Clerk . . . <br /> <br />~ <br /> <br />Name of City - <br /> <br />APPROVED AND ACCEPTED: <br />COUNTY OF WRIGHT <br /> <br />c-.2.!rman of the Board <br /> <br />_'EST: <br /> <br />County Coordinator <br />
The URL can be used to link to this page
Your browser does not support the video tag.