My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 10-08-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2019
>
10-08-2019
>
6.1c ERMUSR 10-08-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 4:18:24 PM
Creation date
10/4/2019 4:18:24 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Operations Director <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> October 8, 2019 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had 14 new house services. <br /> • Continue collecting data with the GPS for our ArcView maps as time permits. <br /> • Finished acquiring the Connexus customers in areas 7 and 8 on September 17. We're in <br /> the process of changing out locks, removing tags from poles, and adding new signage to <br /> the underground equipment.Throughout this process, we'll be verifying what's in the <br /> map book to ensure its accuracy. <br /> • We are waiting on street light poles for the Monroe Estates Addition; the rest the <br /> infrastructure has been completed.There are a total of 13 lots in this addition. <br /> • Continue installing the underground infrastructure for the Lawatsch Farms Addition. <br /> During the installation we will also be rebuilding Pascal Street, Troy Street, and 189th <br /> Avenue. <br /> • Continue with installation of the new poles and light fixtures on Main Street. <br /> • A vehicle struck a street light pole on Twin Lakes Road that needed to be replaced. <br /> • We had a fault on a riser pole, south of the Parish Avenue Bridge. We had to replace the <br /> three phase overhead switch and replace a terminator on one of the underground <br /> phases. <br /> • Installed a single phase transformer for the new Edina Reality building on Parson <br /> Avenue in Otsego. <br /> • The overhead single phase primary fed service at 10000 Highway 10 has experienced <br /> numerous outages due to trees near the lines. We installed a new secondary service <br /> from Fillmore Street to fix the issue. <br /> • Tom Geiser and Dan Plude attendant the NISC Member Information Conference <br /> September 23-26 in St. Louis, Missouri. <br /> Page 1 of 1 <br /> 262 <br />
The URL can be used to link to this page
Your browser does not support the video tag.