Laserfiche WebLink
City of <br />Elk _ <br />River <br />Request for Action <br />To <br />Item Number <br />Arena Commission <br />9• <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Arena Ma na er's Update <br />Aril 17, 2018 <br />Rich Czech, Arena Manager <br />Item Description <br />Reviewed by <br />Arena Manager's Update <br />Cal Portner, Ci T Administrator <br />Reviewed by <br />Action Requested <br />Receive information. <br />Background/Discussion <br />Upcoming Events: <br />■ Ice out in The Barn on April 25 <br />■ Spring Annual Craft Fair is May 5 and G <br />■ Midwest Hockey Tournament will be hosted on April 20 — 22 and May 11 —12 <br />■ Annual Skate Show on May 18 and 19 <br />Completed Summer Projects <br />■ New doors in the hallway of The Barn to the front entrance of the arena <br />■ Cleaned and painted the locker rooms walls throughout the building <br />■ Top ends rebuilt on compressors; Barn # 2/Olympic # 1 <br />Ice Plants <br />The Olympic ice plant has a slow refrigeration leak again and we cannot find the source. If it is in the floor <br />as in 2015 the estimated repair is $84,000. The alternative is to keep adding Freon as needed to get by until <br />the new system is installed. We are awaiting the Council's decision. <br />The Barn Rink also has problems. Over the years, impurities have built up inside the refrigeration pipes <br />in the floor and are causing flow issues. The ice no longer freezes as it should in these areas and black <br />streaks are appearing down the rink where the ice doesn't set up quickly. More areas have developed over <br />the season that are getting longer and wider indicating the problem is getting worse. Like calcium that <br />builds up in an artery, the impurities will continue to build until total failure of the pipe(s). We have made <br />several attempts to clear the pipes without success. Over the next month we will continue to try to clear <br />the pipes, however if we're unsuccessful we will have to determine the next step we want to take, which <br />could include replacing a check valve or worse replacing the pipes in the floor. <br />Financial Impact <br />N/A <br />Attachments <br />N/A <br />PUNE8E8 G1 <br />arldRAYURE <br />