Laserfiche WebLink
<br />Request for Action <br /> <br /> <br />To <br />Parks and Recreation Commission <br />Item Number <br />6.1 <br />Agenda Section <br />Discussion <br />Meeting Date <br />April 10, 2019 <br />Prepared by <br />Steve Benoit, Recreation Manager <br />Item Description <br />Great Northern Trail Closure <br />Reviewed by <br />Michael Hecker, Parks and Recreation Director <br />Reviewed by <br /> <br /> <br />Action Requested <br />Discussion <br /> <br />Background/Discussion <br />The Elk River Landfill Deachate Conveyace system is scheduled to be installed along the Great Norhern <br />Trail. Due to the installation, the Great Northern Trail will need to be closed for a period of time. <br />Schedule for installation of the improvements will be during the summer months of 2019 attempting to <br />avoid the highest use times in the spring and fall. Staff will work with the contractor to minimize <br />closures. <br /> <br /> <br />Financial Impact <br />None <br /> <br />Attachments <br />1. Memorandum from Juntin Femrite, Public Works Director/Chief Engineer <br />2. Elk River Landfill Deachate Conveyace system plans