Laserfiche WebLink
4*- <br /> Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 11, 2018 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • We had 21 new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time permits. <br /> • We have been installing the infrastructure in Area 7 on hold until spring when the frost <br /> comes back out. <br /> • Finished the cleanup work in Areas 5&6 that we acquired from Connexus in September. <br /> • Continue to remove poles that are located in the rear lot line in Otsego. This ongoing job <br /> is performed as a fill in between other jobs as they come in. <br /> • Continue to work on the replacement of 16 poles that didn't pass inspection. This task <br /> will be performed as a fill in between other jobs as they come in. <br /> • Changed out a three phase pole that was struck by a vehicle at the intersection of County <br /> Road 42 and 70th Street in Otsego. <br /> • Installed the infrastructure for a single phase residential service at 17315 65th Street in <br /> Otsego, and 18837 Ogden Street in Elk River. <br /> • Due to a vehicle running into a model 3 switchgear cabinet at the intersection of Waco <br /> Street and 109th Avenue, we replaced the box pad that the switchgear sits on, and part of <br /> the switchgear cabinet that was damaged. <br /> • Replaced a street light pole that was struck by a vehicle at 6th Street and Xenia Avenue. <br /> • Installed a conduit pipe for the city at Rivers Edge Park. The pipe was installed in <br /> preparation for additional electrical outlets to be added to accommodate the summer <br /> concerts. The wiring and installation of outlets will be performed by an electrician. <br /> • Moved a siren pole on HWY 10 west of Edison Street. This change will allow us to help <br /> with the siren maintenance from the road. <br /> • Installed a temporary house service in the Hillside 11th Addition;this addition has 16 lots <br /> in it. The permanent infrastructure has yet to be installed, and as we are now dealing with <br /> frost in the ground, the developer will be working with Michel's to figure out how much <br /> can be done this winter. <br /> Page 1 of 1 <br /> 132 <br />