My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 11-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
11-13-2018
>
6.1c ERMUSR 11-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2018 11:25:43 AM
Creation date
11/9/2018 11:25:43 AM
Metadata
Fields
Template:
City Government
type
ERMUAG
date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elkltive*r=--:�:� <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Mark Fuchs — Electric Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />November 13, 2018 <br />6.1c <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Had 20 new house services. <br />• Continue working on collecting data with the GPS for our ArcView maps as time permits. <br />• Continue installing the infrastructure in Area 7 for the territory we'll be acquiring in <br />2019. <br />• Continue to work in Areas 5&6 that we acquired from Connexus in September. <br />• Finished making up the infrastructure in Miske Meadows 4" and 5" Additions. <br />• Continue to remove poles that are located in the rear lot line in Otsego. This ongoing job <br />is performed as a fill in between otherjobs as they come in. <br />• Began work on the replacement of 16 poles that didn't pass inspection. This task will also <br />be performed as a fill in between other jobs as they come in. <br />• Finished with the installation of three phase underground primary and transformer for <br />Jackson Hills Apartments; this is a 40 unit apartment located at Jackson Avenue and 6th <br />Street. We also hooked up the temporary service at this location. <br />• We had to change out two poles that were hit by vehicles; one was a single phase pole at <br />Spike's Feed, Seed & Pet Supply on HWY 10, and the other one was a three phase pole <br />on 165 1h Avenue near Cargill. <br />• We had to do some minor work on poles that Mi-Tech was attaching fiber to in order to <br />maintain the proper clearances. <br />• Installed three phase underground primary and transformer at the Beaudry Garage at 6 1/2 <br />Street and Proctor Avenue. <br />• Installed the infrastructure for a single phase house service on Brook Road. <br />• We had an overhead primary wire that was tom down at Plaisted Companies. The cause <br />of the damage was due to a truck driver not lowering his dump trailer before driving <br />through the area. <br />• We had a single transformer that was struck in the Tall Pines Addition. <br />• We bored in approximately 300' of 3" water main for the water department at Nile Place. <br />• We had to de -energize Target and Sportech after hours so they could do some work on <br />the inside of their buildings. <br />Page I of I <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.