My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1.PCSR 10-23-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
10-23-2018
>
5.1.PCSR 10-23-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2018 9:51:47 AM
Creation date
10/18/2018 9:49:20 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br /> <br /> <br />To Item Number <br />Planning Commission 5.1 <br />Agenda Section Meeting Date Prepared by <br />Public Hearings October 23, 2018 Chris Leeseberg, Senior Planner <br />Item Description Reviewed by <br />AEGIR Brewing Co. LLC – 19050 Industrial Blvd. Zack Carlton, Planning Manager <br />NW, #1 <br />Reviewed by <br /> Conditional Use Permit to operate a <br /> <br />microbrewery facility <br /> <br />Action Requested <br />Approve, by motion, the Conditional Use Permit as the standards set forth in Section 30-654 have been <br />satisfied and with the following condition: <br /> <br />1. The Conditional Use Permit shall not be recorded until the city building official and fire marshal <br />have inspected, and signed off on, the building for compliance with all state and local building <br />codes. <br /> <br />Background/Discussion <br />Case No. CU 18-17 <br /> <br />The property is 1.46 acres in size, has a land use designation of industrial, and is zoned Light Industrial <br />(I1) where microbreweries require a Conditional Use Permit (CUP). The applicant is seeking a CUP to <br />operate a microbrewery in a portion of an existing 9,000 square foot industrial building. <br /> <br />Transportation/Circulation <br />Access to and from the site will occur at the one existing access on Industrial Boulevard. There is <br />sufficient on-site circulation for the business, customers, and emergency vehicles. <br /> <br />Parking <br />The building is 9,000 square feet in size with the applicant utilizing approximately 2,600 square feet of the <br />overall space. <br /> <br />The ordinance states: Manufacturing, fabricating, general industrial: six stalls plus one off-street parking space for each <br />500 square feet of floor area. <br /> <br />The floor area of the subject building is 9,000 square feet requiring 18 plus 6 parking stalls for a total of <br />24 parking stalls. The site has 32 striped parking stalls and what appears to be room for 8-12 more stalls. <br /> <br />Landscaping <br />The ordinance requires 26 trees for the property. The exiting tree inventory satisfies this requirement. <br /> <br /> <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires prosperity <br />
The URL can be used to link to this page
Your browser does not support the video tag.