Laserfiche WebLink
City of <br /> Elk ..........„ <br /> Memorandum Item: 10.2 <br /> River <br /> To: Parks and Recreation Commission <br /> From: Tim Sevcik, Street and Park Superintendent <br /> Date: October 3,2018 <br /> Subject: Staff Report <br /> Deerfield Hill Park Update <br /> Installation of the new playground at Deerfield Hill Park was completed on September 13, 2018. Staff <br /> conducted removal of the existing playground structure and all materials were donated to Kids Around <br /> The World Playgrounds. In addition staff conducted all site prep,replacement of the timber retaining <br /> i wall, final grading and restoration. Additional work completed within the park included replacing the <br /> Theparkinglot was reduced in size reducingthe <br /> existingparkingarea and trail enteringthe playground. <br /> p Y� <br /> parking capacity from 18 to 9 parking stalls and included the addition of a handicapped parking stall. <br /> Additionally, the trail was reconstructed to meet ADA compliance standards for an accessible route. <br /> Park staff is still awaiting quotes for concrete work to install three concrete slabs in the park for a picnic <br /> table,park bench, and garbage and recycling bins. <br /> i-e / EiEe et <br /> N:\Departments\Parks and Recreation\Commission\Packets\2018\10-03-18 PRC Packet\10.2 Street and Park NATURE <br /> Superintendents Report.docx <br />