My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 09-11-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
09-11-2018
>
5.3 ERMUSR 09-11-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:45:58 AM
Creation date
9/7/2018 2:58:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Eric Volk— Water Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 11, 2018 5.3 <br /> SUBJECT: <br /> Auburn Tower Reconditioning Bids <br /> ACTION REQUESTED: <br /> Award Auburn Tower Reconditioning Bid <br /> BACKGROUND: <br /> The Auburn Tower was originally constructed and painted in 1993; it had some spot repairs <br /> completed in 2014 and 2015. The tower is scheduled to be reconditioned in 2019. We went out <br /> for bids early with the expectation that we would receive better than average bids. I have <br /> attached the inspection report for reference. <br /> DISCUSSION: <br /> The bid opening is scheduled for September 10, 2018 at 1:00 p.m. The bid tabulation will be <br /> provided at the time of the meeting. <br /> FINANCIAL IMPACT: <br /> The cost will be presented at the time of the meeting. <br /> ATTACHMENT: <br /> • 2018 Auburn Tower Inspection Report <br /> Page 1 of 1 <br /> 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.