Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Eric Volk— Water Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 11, 2018 5.3 <br /> SUBJECT: <br /> Auburn Tower Reconditioning Bids <br /> ACTION REQUESTED: <br /> Award Auburn Tower Reconditioning Bid <br /> BACKGROUND: <br /> The Auburn Tower was originally constructed and painted in 1993; it had some spot repairs <br /> completed in 2014 and 2015. The tower is scheduled to be reconditioned in 2019. We went out <br /> for bids early with the expectation that we would receive better than average bids. I have <br /> attached the inspection report for reference. <br /> DISCUSSION: <br /> The bid opening is scheduled for September 10, 2018 at 1:00 p.m. The bid tabulation will be <br /> provided at the time of the meeting. <br /> FINANCIAL IMPACT: <br /> The cost will be presented at the time of the meeting. <br /> ATTACHMENT: <br /> • 2018 Auburn Tower Inspection Report <br /> Page 1 of 1 <br /> 126 <br />