My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 08-14-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
08-14-2018
>
6.1c ERMUSR 08-14-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 9:04:33 AM
Creation date
8/13/2018 9:04:33 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> August 14, 2018 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had ten new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time permits. <br /> • Finished changing out some of our old overhead transformers in the city of Dayton. <br /> • Rebuilt the three phase underground to Elk River RV on Edison Street and installed new <br /> single phase primary for the RV and boat storage building across the street. <br /> • Continue to install the infrastructure in Areas 5&6 heading north of the Waco substation. <br /> This project was started in 2017 and is being done in preparation of the two areas to be <br /> acquired this September. As Connexus is keeping their feeder in these areas, this <br /> additional work is required. <br /> • Changed out a pole that had tested bad and replaced some single phase underground <br /> primary on 199th Avenue. <br /> • Michels Pipeline completed the joint trench at Trace Heights Second Addition, and we <br /> completed our portion of the boring and plowing. These were bigger lots without sewer <br /> and water so it was more economical for us to do part of it; there are a total of 18 lots in <br /> this addition. <br /> • Finished making up the infrastructure in the Tall Pines Addition; this addition has 27 lots <br /> in it. <br /> • Finished rebuilding part of 192 '/z Avenue in Area 3 that we acquired from Connexus last <br /> year. <br /> • Installed a new single phase underground service for the tennis courts at the Elk River <br /> High School. <br /> • Changed out a live front switchgear that was beginning to rust with a dead front <br /> switchgear by Home Depot. <br /> • Replaced a street light that was struck by a vehicle at the intersection of Main Street and <br /> Hwy 169. <br /> • On July 12, ERMU provided mutual aid to Princeton Public Utilities after severe weather <br /> caused significate outages. Zac Johnson, Derek Groebner, Mitch Girtz and Jared Rolstad <br /> were sent to help restore power. A thank you letter from Princeton Public Utilities is <br /> attached. <br /> Page 1 of 2 <br /> 170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.