My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 ERMUSR 08-16-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
08-16-2005
>
6.3 ERMUSR 08-16-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 1:20:33 PM
Creation date
8/6/2018 10:43:32 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River* <br /> Municipal Utilities <br /> 13069 Orono Parkway phone: 763.441.2020 <br /> Elk River, MN 55330 Fax 763 441.8099 <br /> August 5, 2005 <br /> ' To: Elk River Municipal Utilities Commission <br /> Jerry Takle <br /> Jim Tralle <br /> John Dietz <br /> From: Bryan Adams <br /> ' Subject: Substation Upgrades <br /> Due to the continued growth in Elk River, a $600,000 project was scheduled to upgrade <br /> two substations in 2006. The original plan was to purchase a new 15 MVA 69KV <br /> transformer for West Substation. The existing 12 MVA 69KV West Substation <br /> transformer would go to the North Substation. <br /> With the immediate growth in Otsego and electric feeder restraints, the expansion of the <br /> ' Otsego Substation is more necessary than upgrading the North Substation. After staff • <br /> analysis, instead of moving the existing 12 MVA West Substation transformer to the <br /> North Substation, it would serve us better to move it to Otsego. With the expansion of <br /> Station 14 Substation, the North Substation will be adequate for some time in the future <br /> without up-grading. <br /> In doing the Target project research, substation transformers are 20 weeks to 48 weeks <br /> delivery. Our desire is to get the new transformer installed at the West Substation in <br /> April 2006 before the summer peaks. Bids for this transformer will be received on <br /> ' August 30, 2005. Estimated cost is $410,000. This bid also contains an option to <br /> purchase a second identical transformer for Station 14 to accommodate the Target <br /> project. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.