My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2 ERMUSR 08-16-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
08-16-2005
>
6.2 ERMUSR 08-16-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 1:20:28 PM
Creation date
8/6/2018 10:42:46 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities <br /> 13069 Orono Parkway phone: 763.441.2020 <br /> Elk River,MN 55330 Fax 763.441.8099 <br /> August 4, 2005 <br /> To: Elk River Municipal Utilities Commission <br /> Jerry Takle <br /> Jim Tralle <br /> ' John Dietz <br /> From: Bryan Adams <br /> ' Subject: Up Coming Projects <br /> During the last couple of Elk River Municipal Commission meetings, we have been <br /> discussing Otsego's growth and the potential Target Data Center facility. These two <br /> items along with our normal growth have initiated a number of possible projects for the <br /> 111) electric department. Below for your review are listed several projects, costs, and need for <br /> these projects. Some of these projects we may be building sooner than necessary, but <br /> ' they still need to be built. <br /> 1) New feeder from West Substation to Target $825,000 <br /> 2) New feeder from Station 14 to Target $900,000 <br /> ' Less Target Contribution ($375,000) <br /> Target sub-total $1,350,000 <br /> ' 3) Upgrade Substation West with larger transformer— $550,000 <br /> 2006 budget item to support system growth. Will <br /> also support Target. <br /> ' 4) Upgrade Station 14 with New Substation—originally $850,000 <br /> budgeted for 2010 time frame. Will be used to support <br /> Target but not immediately needed with Otsego Substation <br /> addition. Proposed to be constructed now to preserve <br /> space at Great River Energy facility. <br /> 5) New Substation in Otsego needed to support growth. $250,000 <br /> Will replace budgeted feeder in 2007. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.