My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-2005 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2005
>
01-11-2005 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 4:31:28 PM
Creation date
7/23/2018 4:31:28 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
1/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> REGULAR MEETING OF THE <br /> UTILITIES COMMISSION <br /> January 11,2005 <br /> Members Present: Jerry Talde,President;James Tralle,Vice Chair <br /> Absent: John Dietz,Trustee <br /> Staff Present: Bryan Adams, General Manager;David Berg,Water Superintendent; <br /> Patricia Hemza, Office Manager <br /> 1. Call meeting to order January 11,2005 <br /> President Jerry Takle called the January 11,2005 meeting to order. <br /> 2. Consider Utilities Agenda <br /> James Tralle moved to approve the January 11,2005 Utilities Agenda. Jerry Takle seconded <br /> the motion. Motion carried 2-0. <br /> 3. Consider Consent Agenda <br /> At this time the financials were handed out. Pat Hemza reviewed them with the <br /> Commissioners. James Tralle moved to approve the Consent Agenda as follows: <br /> Designate First National Bank official depository for 2005 <br /> Designate Elk River Star News official newspaper for 2005 <br /> December Check Register <br /> December 14,2004 Minutes <br /> Financial Reports <br /> Jerry Takle seconded the motion. Motion carried 2-0. <br /> 5.1 Staff Up-dates <br /> Bryan Adams reported work will start on the 4th engine at the Landfill and the possibility of <br /> updating the air permit for the LFG Generation facility in Elk River Municipal Utilities name <br /> instead of Elk River Landfill to limit public confusion. Elk River Landfill is already updating the <br /> landfill air permit. This will be looked into further before proceeding. CIP fund that was <br /> approved last month for Sherburne County was presented to the Sherburne County Board. <br /> Glenn Sundeen advised the Commissioners that the primary underground distribution in new <br /> developments was discontinued the beginning of the month due to the extreme depth of the frost. <br /> Secondary services will still be installed as needed. Next week crews will start tree trimming. <br /> David Berg notified the Commission on the maintenance of the wells,the calibrating of the <br /> irrigation meters,and future irrigation meters will be 1-1/2"turbo meters. Seven security systems <br /> were sold in December. <br /> 5.2 Review Electric Outage Report <br /> Bryan Adams reviewed the electric outage report for 2004. There were a few major <br /> accidents with vehicle versus pole that lead to extended outages,and more tree trimming needs to <br /> be done to avoid additional outages. The SAIDI, SAIFI, CAIDI,and ASAI ratios were <br /> reviewed. Overall the Elk River Municipal Utilities continue to do a great job from an electric <br /> reliability prospective. No action needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.