My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5.4
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2003
>
05-27-2003
>
Item 5.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 12:13:41 PM
Creation date
7/23/2018 12:13:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Item #5.4 <br /> �j <br /> iik <br /> River <br /> MEMORANDUM <br /> TO: Planning Commission <br /> FROM: Chris Leeseberg, Planner�/ <br /> DATE: May 28, 2003 -� <br /> SUBJECT: Case No. CU 03-I I <br /> Request by STM Development for a Multi-Tenant Building <br /> Request <br /> STM Development requests a Conditional Use Permit to allow the construction of a Multi- <br /> Tenant Retail Building. <br /> 111 60-Day Rule <br /> To comply with the 60-day rule,without and extension,this item needs action by June 23, <br /> 2003. <br /> Location <br /> East of Highway 169, south of Main Street and west of Zane Street. <br /> Lot 2, Block 1, Elk River Crossing 4th Addition <br /> Zoning/Land Use <br /> PUD (Planned Unit Development) /FIB (Highway Business) <br /> Attachments <br /> • Location map <br /> • Memo from City Engineer <br /> • Elk River Crossing PUD Development Standards <br /> • Preliminary Site Plan <br /> • Preliminary Grading Plan <br /> • Preliminary Utility Plan <br /> • • Preliminary Landscape Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.