My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 06-12-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2018
>
06-12-2018
>
6.1c ERMUSR 06-12-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 3:13:02 PM
Creation date
6/11/2018 3:13:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> June 12, 2018 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had 13 new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time permits. <br /> • We finished changing out some street light fixtures to LED in parts of Otsego and along <br /> Highway 10. <br /> • We installed a transformer and bored a conduit across the ERMU parking lot for the <br /> electrician so they could run the wire in for the new car charger at our main office. <br /> • We are changing out some of our old transformers in the city of Dayton. Once they are <br /> removed from service, they'll be tested for PCB's in the oil; if it's determined they're <br /> contaminated they will be disposed of through Clean Harbors. <br /> • We are rebuilding some single phase overhead primary and secondary with single phase <br /> underground primary and secondary on Edison Street. <br /> • We installed four lights for the City at the basketball court located in Lion's Park. <br /> • We installed the three phase primary underground and a padmount transformer for the <br /> Guardian Angels building in Otsego. We also installed three street lights for the City of <br /> Otsego at this location. <br /> • We replaced two house services that went bad over the winter; one was under the road <br /> and the other one went through a swamp. <br /> • We started installing the infrastructure in Areas 5&6 heading north of the Waco <br /> substation. This project was started in 2017 and is being done in preparation of the two <br /> areas to be acquired this September. As Connexus is keeping their feeder in these areas, <br /> this additional work is required. <br /> • Darren Weber, Curt Wark and Jared Rolstad attended the Minnesota Municipal Utilities <br /> Association(MMUA)Underground School held May 15-19 in Marshall, MN. <br /> • I serve on the MMUA Job Safety and Training Committee;this committee helps plan the <br /> schools MMUA puts on throughout the year. At our recent meeting, we worked through <br /> the details of the Overhead School coming up in September, and the 2nd Annual <br /> Minnesota Lineman Rodeo to be held the Monday before the school. <br /> Page 1 of 1 <br /> 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.