My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1.4 ERMUSR 05-08-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
05-08-2018
>
1.4 ERMUSR 05-08-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 9:59:01 AM
Creation date
5/7/2018 9:59:00 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mike Tietz—Technical Services Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> May 8, 2018 1.4 <br /> SUBJECT: <br /> American Public Power Association Certificate of Excellence in Reliability <br /> ACTION REQUESTED: <br /> Receive the APPA Certificate of Excellence in Reliability <br /> BACKGROUND\DISCUSSION: <br /> The American Public Power Association (APPA)recently honored 128 public power utilities <br /> with a "Certificate of Excellence in Reliability" for reliable performance. These utilities have <br /> significantly outperformed the electric industry nationwide averages as gathered by the Energy <br /> Information Administration. APPA collects utility data from nearly 430 public power utilities <br /> nationwide that track their reliability data via the eReliability Tracker. Of those utilities, 253 <br /> were considered to have sound data that was included in the 2017 Annual Benchmarking Report. <br /> The tracker performs calculations for System Average Interruption Duration Index (SAIDI), <br /> System Average Interruption Frequency Index (SAIFI), Customer Average Interruption Duration <br /> Index (CAIDI), Momentary Average Interruption Frequency Index(MAIFI) and Average <br /> Service Availability Index (ASAI) and helps utilities to collect, categorize and analyze their <br /> outage information. <br /> According to the numbers for 2017, ERMU's SAIDI was only 17 minutes (excluding major <br /> events) and 32 minutes (including major events), compared to the industry average of 129 <br /> minutes (excluding major events). In simple terms,that means that averaged out over our 11,489 <br /> distribution customers for 2017, each customer could expect to have a total outage time of about <br /> 17 minutes; that is 112 minutes shorter than the national average for outages. <br /> The American Public Power Association would like to commend Elk River Municipal Utilities <br /> for achieving"exceptional electric reliability in 2017". <br /> ATTACHMENT: <br /> • APPA Certificate of Excellence in Reliability <br /> Page 1 of 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.