My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2 PCSR 05-24-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
05-24-1994
>
6.2 PCSR 05-24-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 3:05:32 PM
Creation date
4/2/2018 3:05:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 ( `� ) A\ ( AGENDA ITEM 6.2 <br /> ty of MEMORANDUM <br /> �lk_ft/ • <br /> River <br /> TO: PLANNING COMMISSION <br /> FROM: STEPHEN ROHLF, BUILDING <br /> AND ZONING ADMINISTRATOR <br /> DATE: MAY 18, 1994 .7c,t1 o4 <br /> SUBJECT: FINAL ENVIRONMENTAL IMPAC <br /> STATEMENT ON GRAVEL MINING <br /> Included with this memo is the proposed final Environmental Impact Statement (EIS) on <br /> mineral excavation. The final EIS is basically made up of the following components: <br /> Front <br /> A summary of each of the sections in the draft Environmental Impact Statement . <br /> • Middle Section <br /> The City's responses to the comments received on the draft (both verbal and written). <br /> The comment is in bold type and the response by the City follows. <br /> Final Section <br /> The results of a pumping test that was done to verify the assumptions made on what <br /> impacts gravel washing operations would have on the aquifer. <br /> The comment period for the final EIS ends on June 20, 1994. On that date the City <br /> Council will be acting on whether or not to declare the EIS adequate. The Planning <br /> Commission can make comments on the final EIS if they wish. The final EIS should be <br /> added to the same three ring binder that contains the draft EIS, and the old cardboard <br /> insert on the cover should be exchanged with the new one attached to the final EIS. Keep <br /> in mind, that the final EIS and the draft EIS go together as one complete document. If <br /> you have any questions, feel free to call me. <br /> • <br /> P.O. Boxp4Asigc 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.