My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. PRSR 10-17-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2017
>
10-17-2017
>
8.2. PRSR 10-17-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2017 10:10:07 AM
Creation date
10/13/2017 10:10:06 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
10/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item: 8.2 <br /> Elkdfr/ <br /> Memorandum <br /> River <br /> To: Parks and Recreation Commission <br /> From: Tim Sevcik,Park Superintendent <br /> Date: October 10, 2017 <br /> Subject: Staff Report <br /> Athletic Complexes <br /> Installation of the concrete slabs for the new dugouts at the Youth Athletic Complex and Oak Knoll is <br /> complete. The dugout kits are scheduled to arrive the week of October 16,2017 and installation of the <br /> dugout kits will begin the following week. The priority for installation of the kits is YAC to allow time <br /> for the concrete contractor to install the stone wall;however installation will be dependent on the <br /> weather and may need to be installed in the spring. <br /> Trail Projects <br /> All trail construction projects are complete for 2017. In addition to the planned trail projects, staff has <br /> been busy patching and repairing the existing trails. Numerous trail segments had small potholes, <br /> broken edges,and sunken areas as a result of gopher tunnels under the trails. <br /> Picnic Tables <br /> New picnic tables were purchased for the two smaller shelters at Orono Park. The new tables are <br /> square in shape and allow for better use of the space within the shelters. The existing tables were <br /> distributed to other parks throughout the city to replace the old homemade picnic tables which are no <br /> longer serviceable. <br /> Dave Anderson Athletic Complex Irrigation <br /> Installation of the new irrigation system at the Dave Anderson Athletic Complex will begin around <br /> October 23,2017. All work within the playing surfaces will be completed this fall pending weather <br /> conditions;however it is likely the needed upgrades to the existing wells will carry over into the spring. <br /> The work on the wells in the spring should not impact the playing fields;however there will be impacts <br /> to fall adult softball as they are scheduled to play on the fields through October 31. <br /> r ® / EREI IT <br /> N:\Departments\Parks and Recreation\Commission\Packets\2017\10-17-17 PRC Packet\8.2 Park Superintendents NATURE <br /> Report.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.