My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.10. SR 09-18-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
09-18-2017
>
7.10. SR 09-18-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2017 11:53:09 AM
Creation date
9/14/2017 2:51:28 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EGty1� ,.,�� Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 7.10 <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearin s ISeptember 18, 2017 Zack Carlton,Planning Manager <br /> Item Description Reviewed by <br /> Easement Vacation and Final Plat: Tall Pines PUD Chris Leeseber , Senior Planner <br /> Reviewed by <br /> Cal Portner, City Administrator <br /> Action Requested <br /> Adopt,by motion, a resolution to vacate drainage and utility easements with the condition that the Final <br /> Plat of Tall Pines PUD must be recorded at the same time the easement vacation resolution is recorded. <br /> Adopt,by motion, a resolution granting Final Plat of Tall Pines PUD with the following conditions: <br /> 1. All conditions of approval for the Conditional Use Permit (CUP) establishing the PUD for this <br /> development shall be satisfied. (Case No. CU 17-17) <br /> 2. All conditions of approval for the Preliminary Plat of The Pines at Elk River PUD shall be <br /> satisfied. (Case No. P 17-09) <br /> 3. A utility easement over all of Outlots B and C must be added to account for access to small <br /> utilities (gas, electric, telephone). <br /> 4. Surface Water Management Impact Fee be satisfied in the amount required by the city when the <br /> Final Plat is released for recording (currently$233/lot). <br /> 5. Water Availability Charge shall be satisfied in the amount required by the city when the Final Plat <br /> is released for recording (currently$345/ plumbing unit). <br /> 6. Development Plan shall be approved by the city engineer prior to issuance of building permits. <br /> 7. All necessary permits shall be secured from the city and Elk River Municipal Utilities prior to <br /> commencing construction. <br /> 8. Any item or condition found that indicates the site is likely to yield information important to pre- <br /> history or history shall be reported to the city immediately. Further, the city reserves the right to <br /> stop work authorized in its approval until the site is appropriately investigated and work is <br /> authorized. <br /> Background/Discussion <br /> Case Nos. EV 17-05 & P 17-18 <br /> The applicant,Roger Derrick with the Pines at Elk River, LLC,purchased two adjoining parcels on 183Td <br /> Circle NW and proposes to develop both parcels as 26 detached townhome units. The project will be <br /> similar to the West Oaks project,which was also developed by Mr. Derrick. Some units will have the <br /> option for a walkout basement. Kliever Lake Fields and Miske Meadows have also included detached <br /> townhome units similar to those proposed with this project. <br /> City Council approved a Zone Change, Conditional Use Permit to establish a Planned Unit Development, <br /> and the Preliminary Plat of The Pines at Elk River PUD on July 17, 2017. The applicant is seeking final <br /> POWERED 6T <br /> A IR <br />
The URL can be used to link to this page
Your browser does not support the video tag.