My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e ERMUSR 09-12-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
09-12-2017
>
6.1e ERMUSR 09-12-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2017 4:06:12 PM
Creation date
9/8/2017 4:06:12 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Eric Volk—Water Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 12, 2017 6.1e <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Delivered 14 new water meters. <br /> • Sealed the water meter, and took curb stop ties from eight water services. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria <br /> o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards <br /> o Submitted MDH Fluoride Report <br /> • Completed the MDH required THM/HAA5 samples at both of our monitoring locations. <br /> • Submitted MPCA Discharge Monitoring Report(DMR) for the Diesel Generation Plant. <br /> • Well#6 has been reinstalled. The meter, which also needs to be replaced, is on order and <br /> expected to be in within a few weeks. <br /> • All of the leaking hydrants that were identified in the leak detection survey have now <br /> been repaired. <br /> • The last of the punch list items have been completed at the Water Treatment Plant#7 <br /> Expansion; the final pay application has also been submitted. The job will be closed out <br /> in the coming weeks. <br /> • The installation of the water main along Highway 10 between Simonet Drive and Xenia <br /> Avenue began on September 8. The connection will take place the week of October 17. <br /> All of this work is being performed by ERMU staff. <br /> • Throughout the month of September the tainter gates at the dam will be getting painted. <br /> We will be lowering the lake roughly three feet on October 4 to complete the annual <br /> inspection of the dam. <br /> ATTACHMENTS: <br /> • August 2017 Pumping by Well <br /> • August 2017 Accumulated Precipitation Graph <br /> • August 2017 Daily Temperature Graph <br /> Page 1 of 1 <br /> 92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.