My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 09-12-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
09-12-2017
>
6.1c ERMUSR 09-12-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2017 4:00:36 PM
Creation date
9/8/2017 4:00:36 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 12, 2017 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had sixteen new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Construction continues on the Waco 2 substation. The substation transformer was <br /> delivered on August 28, and on September 6 Waukesha was here to install the cooling <br /> radiators and 69kv high bushings. Attached are pictures of the delivery of the <br /> transformer. <br /> • Continue setting transformers, street lights and terminating the wire in Miske Meadows <br /> 1st and 2nd Addition. This part of the project consists of 86 residential lots. <br /> • Continue to work on getting infrastructure placed for the acquisition of Areas 3&4 on <br /> September 19. <br /> • Continue installing the infrastructure in Areas 5&6 heading north of the Waco substation. <br /> These two areas will be acquired in 2018. These areas are more work because Connexus <br /> is keeping their feeder in these areas. <br /> • Michels Pipeline has the utilities installed in Prestigious Woodland Hills 4th Addition. <br /> There are 21 residential lots in this addition. <br /> • We have the three phase underground wire installed at the Sherburne County Courthouse. <br /> We will finish this project after they get their secondary wires installed. <br /> • We had two poles that were struck by vehicles; one was a three phase pole on County <br /> Road 33 in Elk River and the other was a singe phase pole on 95th Street in Otsego. <br /> • We also had two street light poles that were hit; one on Twin Lakes Road in Elk River <br /> and one at the intersection of 72nd and Quigley in Otsego. <br /> ATTACHMENTS: <br /> • Photos—Waco 2 Substation Project—Delivery and Installation of Transformer <br /> Page 1 of 1 <br /> 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.