Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> August 8, 2017 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had eight new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue construction on Waco 2 substation. The conduits for the six feeders and the <br /> conduits for the control wires have been installed. The ground grid is installed and most <br /> of the steel structures are up. The fence is also been put up. We are also pulling primary <br /> wire into substation when completed there will be three new feeders. Attached are <br /> pictures of the progress. <br /> • Finished working along Highway 10 from Gary Street to Xenia Avenue. We will be <br /> pulling conduits through a water main once it's abandoned next year. <br /> • Installed three phase primary wire and a transformer for PetSmart. <br /> • Replaced switchgear that was damaged over the winter at 18894 Dodge Street. <br /> • Wildflower Meadows 6th Addition in Otsego is complete; it consists of 24 residential lots. <br /> Michels Pipeline did the joint trench and we installed the transformers and did the <br /> terminating of wire. <br /> • Michels Pipeline started installing utilities in Miski Meadows. This part of the project <br /> consists of 86 residential lots. <br /> • Began working on getting the infrastructure placed for the acquisition of Areas 3&4 in <br /> September. <br /> • Began placing wire heading north of the Waco substation in anticipation of Areas 5&6 <br /> that will be acquired in 2018. Areas 5&6 will be more work because Connexus is keeping <br /> their feeder in these areas. <br /> • Detroit Lakes requested mutual aid after a storm went through their city. We sent four of <br /> our lineworkers to help them out July 12 -14. <br /> ATTACHMENTS: <br /> • Photos—Waco 2 Substation Project <br /> Page 1 of 1 <br /> 115 <br />