My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. PRSR 08-09-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2017
>
08-09-2017
>
8.2. PRSR 08-09-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 3:34:36 PM
Creation date
8/7/2017 3:34:36 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
8/9/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'."-(1/4 „, <br /> Elly ........„ <br /> Memorandum Item: 8.2 <br /> River <br /> To: Parks and Recreation Commission <br /> From: Tim Sevcik,Park Superintendent <br /> Date: August 3,2017 <br /> Subject: Staff Report <br /> Athletic Complexes <br /> Damage to the backstops and fencing at the Dave Anderson Athletic Complex from the June storms <br /> has been repaired and all four softball fields are now back in use. <br /> Staff is working on midsummer repairs to the Oak Knoll Athletic Complex football and lacrosse fields. <br /> Staff is installing new sod to the goal areas of the lacrosse fields in preparation for the start of football <br /> on both fields as well as striping the fields for football. <br /> Staff continues to work on finishing the inside of the Youth Athletic Complex concession building. The <br /> upstairs of the building was never finished and a leaking roof had caused damage to the ceiling. Staff <br /> has made the necessary repairs to the roof and replaced damaged sheetrock,installed wood trim and <br /> mudded and taped all of the drywall. Staff will paint the interior of the building as time permits. <br /> Trail Projects <br /> Construction of the trail segment near the library was completed in July and the contractor has begun <br /> work on the trail segments at Kliever Lake Fields and the north side of the Ice Arena. Both sections of <br /> new trail are anticipated to be complete in August. <br /> Barrington Park Playground <br /> Replacement of the Barrington Park playground was completed this week and staff will be installing the <br /> new playground woodchips with the intent to have the playground open to the public by August 11. A <br /> new ADA accessible concrete sidewalk was added from Auburn Place NW to the playground as well as <br /> two picnic table slabs in the park. Public input has been very positive with many residents stopping by <br /> to thank staff and the city for providing the new facility. <br /> P R W E R E D 11 <br /> N:\Departments\Parks and Recreation\Commission\Packets\2017\08-09-17 PRC Packet\8.2 Park Superintendents NATURE <br /> Report.docx �y <br />
The URL can be used to link to this page
Your browser does not support the video tag.