My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 08-07-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
08-07-2017
>
8.2. SR 08-07-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2017 1:58:43 PM
Creation date
8/3/2017 1:56:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/7/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EGty1� ,.,�� Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 8.2 <br /> Agenda Section Meeting Date Prepared by <br /> Discussion August 7, 2017 Tim Sevcik, Park Superintendent <br /> Item Description Reviewed by <br /> Dave Anderson Athletic Complex Irrigation Cal Portner, City Administrator <br /> Replacement Reviewed by <br /> Action Requested <br /> Provide staff direction,by motion, for the funding and replacement of the irrigation system and well at <br /> the Dave Anderson Athletic Complex. <br /> Background/Discussion <br /> The Dave Anderson Athletic Complex was developed in 1987 and consists of four softball fields. The <br /> complex was built largely by the lead of our previous street superintendent with a lot of assistance from <br /> volunteers and professional services provided by Professional Turf and Renovation (Hopko). <br /> The irrigation system was installed by city staff and consisted largely of residential-grade equipment. <br /> From 1987 to 1992, the system drew water from Lake Orono. The use of lake water resulted in the <br /> introduction of micro-organisms, sand, and gravel into the irrigation lines. <br /> In 1992, a 4-inch well with a 3-hp pump was drilled to provide for a cleaner and more efficient water <br /> source. While sufficient for the residential irrigation system, the well consistently pulled fine sand and <br /> deposited into the irrigation lines. In 2012, a spin down filter and variable frequency drive were added to <br /> stop sand from entering. <br /> During spring startup, staff found over half of the irrigation heads failed to operate. An irrigation <br /> contractor inspected the system and identified sand,gravel,rust scale, and organic materials in the <br /> irrigation lines resulting in the failed system and requiring replacement. <br /> Central Irrigation designed a new commercial-grade irrigation system and received three quotes for the <br /> installation. Additionally,it was identified that upgrades to the well are required to provide sufficient <br /> water flow for the system. Option #1 upgrades the well with a 10-hp pump. Option #2 requires drilling <br /> a new 6-inch well with a 20-hp pump. <br /> Staff recommends Option #2 as 10-hp pumps are not typically designed for 4-inch wells and may result <br /> in premature failure of the well requiring drilling of a new well in the future. <br /> Financial Impact <br /> This replacement project was not planned nor budgeted for 2017. The Park Improvement Fund may <br /> have adequate funding if planned and budgeted project estimates are accurate and project contingencies <br /> are not needed. If funds are not available, Council could allocate 2016 excess fund balance. <br /> POWERED 6T <br /> Template Updoted 4/14 INAWRE1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.