My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. LIBSR 8-01-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Packets
>
2010-2019
>
2017
>
08-01-2017 SPECIAL
>
5.3. LIBSR 8-01-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 12:29:00 PM
Creation date
8/2/2017 12:28:59 PM
Metadata
Fields
Template:
City Government
type
LIBSR
date
8/1/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 <br /> c ry 'f <br /> EIL <br /> � Staff Report <br /> River <br /> To Item Number <br /> Library Board hcrc to tt'Xt`. <br /> Agenda Section rMeeting Date Prepared by <br /> hcrc to tt'Xt`. I August 1,2017 Tim Sevcik, Park Maintenance Superintendent <br /> Item Description Reviewed by <br /> Library Grounds Maintenance Report <br /> Reviewed by <br /> Action Requested <br /> None <br /> Background/Discussion <br /> The recent storms throughout the city resulted in seven trees around the library campus being uprooted <br /> or damaged to the point of requiring removal. The trees were removed; however, stump removal is still <br /> required. Stumps removal will be coordinated to coincide with stump removal around the city hall <br /> campus. <br /> As a result of the paving projects on Orono Parkway and for the new trail on the south side of the library <br /> parking lot,irrigation needed to be shut off for several days to allow for paving work to be completed. In <br /> addition, during excavation for the new trail segment the irrigation electrical lines were inadvertently cut <br /> by the contractor while preparing the trail subgrade. The combination of these two events resulted in the <br /> irrigation being off for nearly a week at the library campus, causing the dry grass. Staff is working with an <br /> irrigation vendor to make the necessary repairs and get the system up and running again. <br /> The landscape beds within the library will receive mulch topdressing during the week of July 171h in <br /> preparation for the county fair and parade. <br /> The parking lot curbing project is scheduled for 2017, though no date has been set. This project will be <br /> conducted in conjunction with other curbing projects throughout the city. The City Engineer stated that <br /> for the rest of the parking lot,he will reevaluate any other treatments once the curbing is complete to <br /> determine if a fog sealing treatment or other treatments may be necessary in future years but currently <br /> does not believe any treatments are required for this parking lot. <br /> Financial Impact <br /> Attachments <br /> (Continued on back) <br /> NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.