My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 06-13-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
06-13-2017
>
6.1c ERMUSR 06-13-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 10:48:40 AM
Creation date
6/13/2017 10:48:40 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> June 13, 2017 6.l c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had six new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue rebuilding 165th Ave; this is in Area 2 that we acquired from Connexus. <br /> • Started construction on Waco 2 substation. Granite City Construction will be the <br /> contractor doing the work. <br /> • Finished rebuilding Presidential Estates. <br /> • Michels Corporations installed the wire and transformer box pads along with gas, cable <br /> and telephone to seventeen lots at Wildflower Villas in Otsego. We set the transformers, <br /> street lights and will also be doing the terminating of wire. <br /> • We have the new primary underground installed along Highway 10 east of the bridge. <br /> We still need to move a switchgear cabinet and some poles and anchors along bridge <br /> going to the west. <br /> • Installed a new three phase service for Apex Embroidery on Gateway Road. <br /> • Installed a new three phase service for Chow Fresh Grill and Barbeque on Business <br /> Center Drive. <br /> • Directional bored in some conduits for the parks department at YAC and Oak Knoll for <br /> score boards. <br /> • Working on installing five new services for CenturyLink. <br /> • Installed a new single phase primary and transformer service for BNSF. <br /> • Replaced two overhead taps with underground towards the west end of our service <br /> territory on County Road 39 in Otsego. <br /> • I attended the APPA Engineering and Operations Technical Conference. Some of the <br /> breakout sessions I attended where: The A-Z of Improving Reliability; Pole Attachments: <br /> One Touch Transfers; Safety Tracking Made Easier; Substation 101: Design and <br /> Commissioning Issues; Integrated Data Management: Top 10 Strategies; and EV's: <br /> Charging Toward a New Future. It was a very good conference. <br /> Page 1 of 1 <br /> 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.