My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. LIBSR 05-23-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Packets
>
2010-2019
>
2017
>
05-23-2017
>
5.2. LIBSR 05-23-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 2:40:08 PM
Creation date
5/18/2017 2:40:06 PM
Metadata
Fields
Template:
City Government
type
LIBSR
date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 <br /> c ry 'f <br /> Efl <br /> � Staff Report <br /> River <br /> To Item Number <br /> Library Board hcrc to tt'Xtt <br /> Agenda Section [Meeting Date Prepared by <br /> hcrc to ��2it��r tt'] Q`. Ma 23, 2017 Tim Sevcik, Park Maintenance Superintendent <br /> Item Description Reviewed by <br /> Library Grounds Maintenance Report <br /> Reviewed by <br /> Action Requested <br /> None <br /> Background/Discussion <br /> (From Parking Lot): Pressure washing of the exterior of the building has been completed - algae and <br /> moss were removed. There is some rust staining on the building caused from irrigation water that could <br /> not be removed. <br /> (From Parking Lot): Tree and stump removal has been completed along the eastern edge of the library as <br /> well as near the book drop area. Additionally,rock has been added around the down spouts on the east <br /> and north sides of the library where erosion issues had been a concern in the past. <br /> Prescribed fire management was completed on May 3 in the rain garden areas around the library as well as <br /> the prairie area near the windmill. The prescribed fires will help to suppress non-native cool season <br /> grasses while promoting the native species. <br /> (From Parking Lot): Concrete curb and gutter will be installed in XXX 2017 within the parking lot area as <br /> well as removal of the current curb stops. Curbing will be added around the rain garden in the center of <br /> the parking lot and along the sidewalk on the north edge of the parking lot. <br /> Financial Impact <br /> Attachments <br /> PARKING I A ' '7IIr <br /> • LED light/bollard replacement (will do in 2016) <br /> NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.