My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 04-12-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
04/12/1999
>
5.2. SR 04-12-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:15 AM
Creation date
2/24/2005 2:31:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/12/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ITEM 15.2. <br /> <br />. <br /> <br /> <br />Howard R. Green Company <br />CONSULTING ENGINEERS <br /> <br />April 8, 1999 <br />File: 801760J-0071 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE: TRUNK HIGHWAY 10/171 ST AVENUE SIGNAL IMPROVEMENT <br /> <br />Dear Council Members: <br /> <br />We have tabulated the bids for the TH 10/171st Avenue Signal improvement opened on <br />Tuesday, April 6, 1999, at 10:00 a.m. There were a total of four bidders. The names of the <br />bidders and their total bid appear in the following table: <br /> <br />. <br /> <br />Accurate Electric, Inc. <br />Killmer Electric, Inc. <br />Ridgedale Electric, Inc. <br />Design Electric, Inc. <br /> <br />$169,221.26 <br />173,832.03 <br />179,726.72 <br />190,570.00 <br /> <br />The Engineer's Estimate for this project was approximately $183,000.00. Accurate Electric is <br />approximately 8% under the Engineer's Estimate. Accurate Electric has not performed work in <br />the City of Elk River previously; therefore, we contacted Tom Dumont, Assistant Traffic <br />Engineer for MnDOT District 3, for a reference. Mr. Dumont indicated that Accurate Electric has <br />done a substantial amount of work in the St. Cloud area and MnDOT has always found their <br />work to be of good quality. Therefore, we would recommend award of the contract to Accurate <br />Electric, Inc., in the amount of $169,221.26. Attached is a resolution for the City Council's <br />consideration accepting the bid and authorizing the execution of the contract. <br /> <br />We have had a brief discussion with Accurate Electric regarding the timing of this project. They <br />have indicated that they would like to begin immediately and hope to have all the equipment <br />available for installation within six to eight weeks. Therefore, it is anticipated the signal could be <br />up and operational in early summer of 1999. <br /> <br />If you have any questions, I will be in attendance at your April 12, 1999, City Council meeting. <br /> <br />Sincerely, <br /> <br />. <br /> <br />Howard R. Green Company <br /> <br />~~-) <br />< 'a.t?U/I/ <br />Terry J. aurer, P.E. <br /> <br />T JM:tw <br />Attachment <br /> <br />O:\PROJ\80 1760j\760-0803.apr99 .doc <br /> <br />1326 Energy Park Drive. St. Paul, MN 55108 . 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.