Laserfiche WebLink
5.4 <br /> Library Zones Report <br /> Elk River Public Library Board <br /> The Library Board serves in an advisory capacity to City of Elk River for issues related to the Elk River <br /> Public Library grounds, the physical building and interior fixtures. The city is responsible for scheduling and <br /> coordinating all work to be completed. <br /> Updated:03-09-17 <br /> • <br /> �//,U�k aka �„m:.enee.S� rm,�e„ �,,.m.w r s ._,��,._:... ,.-,.,k un , � � ,,.�,.,. ,. ..,� ,.. .. a„�,.ec ��.,�� i�,.. ,. .__ i/u :,�.�✓'� <br /> Zone 1 Mary K. Entrance; butterfly New/Unassigned: <br /> garden; windmill, <br /> prairie grass; rain In Progress: <br /> garden in parking lot, * Parking lot curbs/gutters—will do in 2017 when Orono <br /> planter boxes for Pkwy redone (2/9/16) <br /> Master Gardeners * LED light/bollard replacement—Parks will do in 2016 <br /> summer gardening (2/9/16) <br /> program <br /> Zone 2 Willie Front door, front New/Unassigned: <br /> garden, concrete * <br /> pathways, patio, flag In Progress: <br /> turnaround * <br /> Zone 3 Mary E. Rain garden, book New/Unassigned: <br /> drop turnaround, * <br /> employee parking lot; In Progress: <br /> being a good neighbor * LED light/bollard replacement— Parks will do in 2016 <br /> (2/9/16) <br /> * Remove tree stumps - Parks do in Spring 2017 (12-14- <br /> 16) <br /> Zone 4 Mick Being a good neighbor, New/Unassigned: <br /> grass & rock areas * <br /> In Progress: <br /> * Pressure wash discoloration on building facing Orono <br /> Pkwy- Parks will do Spring 2017 (12-14-16) <br /> Zone 5 Rita Rain garden, interior New/Unassigned: <br /> and exterior building * <br /> maintenance, interior In Progress: <br /> furniture and shelving * Pressure wash cobwebs by fireplace and door- Parks <br /> will do Spring 2017 (12-14-16) <br />