Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> March 13, 2017 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had six new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue tree trimming. <br /> • Continue rebuilding 165th Ave; this is in Area 2 that we acquired from Connexus. <br /> • Started ordering material for Waco 2 Substation. <br /> • Had a pre-construction meeting for Wildflower Meadows 6th Addition which consists of <br /> 24 residential lots in Otsego, and a pre-construction meeting for Miske Meadows <br /> development which consists of 86 residential lots in Elk River. <br /> • The City shop does D.O.T.'s for our trucks and trailers. They will be doing these during <br /> February, March and April. <br /> • Diversified did our annual inspections on the bucket and digger trucks. The inspections <br /> include: Visual/Operational, Magnetic Particle, Dielectric, Load and Acoustic Emission <br /> Testing. <br /> • We interviewed two applicants for the Locator position on February 24. We extended an <br /> offer to, which was accepted by Jon McLean. His first day will be March 13. <br /> E. Page 1 of 1 [ IVUIi1E <br /> Reliable Publicx <br /> Power Provider POWERED T o $ERV E <br /> 264 <br />