My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1b ERMUSR 03-13-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
03-13-2017
>
6.1b ERMUSR 03-13-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 2:20:50 PM
Creation date
3/10/2017 2:19:22 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River ---� <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Theresa Slominski—Finance and Office Manager <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> March 13, 2017 6.1b <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> Our auditors, Abdo, Eick, &Meyers,were onsite for fieldwork Thursday and Friday,March 2nd <br /> and 3rd. Everything went well and staff was able to answer questions and provide documentation <br /> requested. They still have to complete the proposed entry for the GASB 68 accrual related to the <br /> pension at PERA. The City's onsite fieldwork with their auditors will be the week of March <br /> 13th. We are anticipating presentation of the audit at the April commission meeting. <br /> April 15th will be the end of the cold weather rule and we anticipate high numbers for shutoffs <br /> once this ends. We have been hanging a lot of red tags (the notification during the cold weather <br /> rule period of October 15th to April 15th in lieu of shutting power off) and they have not <br /> generated a lot of payment activity or even communication. Sometimes, after being shut off <br /> disgruntled customers reach out to the commissioners and so this is just a heads up. We will have <br /> another commission meeting before that date and should be able to provide more information at <br /> that meeting. <br /> There are several reports due this time of year for the Energy Information Association (EIA) and <br /> MISO (Midwest Independent System Operator). The EIA reports are informational and relate to <br /> our engines at the plant and the landfill, our system infrastructure and performance, sales results, <br /> and some energy conservation information for the prior 2016 year. The MISO reports are based <br /> on 2015 information for determining our transmission rebates we will receive as being a part <br /> owner of the transmission systems with MMTG. <br /> PINEIEI BY <br /> ® Page 1 of 1 NATURE <br /> Reliable Pttilic <br /> Power Provider POWERED T O S ERV E <br /> 263 <br />
The URL can be used to link to this page
Your browser does not support the video tag.